22 Applications for Planning Permission - Plans Determined by the Committee PDF 40 KB
Additional documents:
Minutes:
*The Committee considered the under-mentioned applications in light of reports by the Development Management and Conservation Manager and resolved as follows:-
In accordance with Minute No. 299 (2001/2002), William Marshall (objector’s representative) addressed the meeting.
Temporary consent
1. The compound hereby permitted is granted for a limited period of five years only, expiring on 01.07.2024. On or before this date the hereby permitted use shall cease, all materials, equipment and structures brought onto the site in connection with the use shall be removed and the land restored to its former condition in accordance with a scheme of work submitted to and approved in writing by the Local Planning Authority.
In accordance with submitted plans
2. All external dimensions and elevational treatments shall be as shown on the approved plan/s ‘Revised plan as proposed’ (dated 03.04.2019), with the exception of any approved non material amendment.
3. In respect of the details shown on the hereby approved 'revised plan as proposed' (dated 03.04.2019) the insulation boards situated between the containers shall be installed within two months of the date of this decision and retained for the life of the development.
Hours of operation
4. Unless otherwise agreed by the Local Planning work shall only be carried out on site between 8:00am to 6:00pm Monday to Friday, 9:00am to 6:00pm on a Saturday and between the hours of 10:00am to 6:00pm on a Sunday or public holiday. The term ‘work’ shall include the operation of mobile and fixed plant/machinery and equipment, (e.g. generators) radios and the delivery of construction materials.
1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
2. All external dimensions and elevational treatments shall be as shown on the approved plans (listed below) with the exception of any approved non material amendment.
· Drawing Number 14:14:33 Rev A - received on 01 May 2019 - Proposed Site Plan:
· Drawing Number 14:14:30 Rev A - received on 01 May 2019 - Proposed Ground Floor Plan;
· Drawing Number 14:14:31 - received on 21 Feb 2019 Proposed First Floor Plan;
· Drawing Number 14:14:32 - received on 21 Feb 2019 Proposed Elevations;
· Drawing Number Un-numbered - 1/1250 Scale - Location Plan - received on 21 Feb 2019 - Proposed First Floor Plan;
· Drawing Number 14:14:3 ... view the full minutes text for item 22