*The Committee considered the under-mentioned applications in light of reports by the Development Management and Conservation Manager and resolved as follows:-

 

CHE/19/00385/FUL - ERECTION OF 72 BED CARE HOME WITH ASSOCIATED PRIVATE AMENITY SPACE WITH PARKING FACILITIES INCLUDING CHANGE OF USE FROM SUI GENERIS CAR PARK (REVISED DRAINAGE AND FLOOD RISK STRATEGY REC’D 12/09/2019 (V4.0), 04/10/2019 (V5.0) AND DESCRIPTION AMENDED 23/10/2019) – LAND ADJACENT TO 6 ASHGATE ROAD AND ASHGATE ROAD CAR PARK, ASHGATE ROAD, CHESTERFIELD, DERBYSHIRE FOR ASHGATE ROAD DEVELOPMENTS LTD

 

In accordance with Minute No. 299 (2001/2002) Mike Etchells (applicant’s architect and agent) was available to answer questions.

 

That the officer recommendation be upheld and the application be approved subject to the following conditions:-

 

Time Limit etc

 

1.  The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

2.  All external dimensions and elevational treatments shall be as shown on the approved plans (listed below) with the exception of any approved non material amendment.

7831-03-001 – Site Location Plan

7831-03-002 – Site Plan as Existing

7831-03-003 A – Proposed Site Layout

7831-03-004 A – Level One Proposed

7831-03-005 A – Level Two Proposed

7831-03-006 A – Level Three Proposed

7831-03-007 A – Level Four Proposed

7831-03-008 A – Proposed Elevations

7831-03-009 A – Proposed Elevations

7831-03-010 A – Proposed Site Sections

JKK 10474- FIGURE 01 01.01 REV P1 – Tree Constraints Plan

Arboricultural Impact Assessment by RPS dated April 2019

Design and Access Statement by HSSP Architects dated May 2019

Drainage Strategy and Flood Risk (revised 12/09/2019) - P19100-HWA-ZZ-XX-RP-C-5000-P04  

Ecological Appraisal by Encon Associates dated April 2019 (Rev A)

Ecology Site Revisit by Encon Associates dated April 2018

Landscape Strategy by DSA Environment and Design dated June 2019 - 1123 001 A

Transport Statement by HWA Ltd and AD Infrastructure Ltd dated June 2019

Tree Schedule by RPS dated April 2019

Geo-environmental Report by iD Geoenvironmental Ltd dated April 2019

 

Drainage

 

3.  The site shall be developed with separate systems of drainage for foul and surface water on and off site. The maximum foul water discharge rate shall not exceed 5 (five) litres per second. 

 

4.  There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works , details of which will have been submitted to and approved by the Local Planning Authority . If discharge to public sewer is proposed, the information shall include, but not be exclusive to:-

 

a)  evidence to demonstrate that surface water disposal via infiltration or watercourse are not reasonably practical;

 

b)  evidence of existing positive drainage to public sewer and the current points of connection; and

 

c)  the means of restricting the discharge to public sewer to the existing rate less a minimum (30)% reduction, based on the existing peak discharge rate during a 1 in 1 year storm event, to allow for climate change.

 

5.  No development shall take place until a detailed design and associated management and maintenance plan of the surface water drainage for the site, in accordance with the principles outlined within:

 

a. ‘DRAINAGE STRATEGY & FLOOD RISK STATEMENT v5.0’ (HWA Consulting Engineers, May 2019) including any subsequent amendments or updates to those documents as approved by the Flood Risk Management Team

 

b. And DEFRA’s Non-statutory technical standards for sustainable drainage systems (March 2015),

 

have been submitted to and approved in writing by the Local Planning Authority. The approved drainage system shall be implemented in accordance with the approved detailed design, prior to the use of the building commencing.” No objections in principle

 

6.  No development shall take place until a detailed assessment has been provided to and approved in writing by the Local Planning Authority, to demonstrate that the proposed destination for surface water accords with the drainage hierarchy as set out in paragraph 80 reference ID: 7-080-20150323 of the planning practice guidance.

 

I. into the ground (infiltration);

II. to a surface water body;

III. to a surface water sewer, highway drain, or another drainage system;

IV. to a combined sewer.

 

7.  Prior to commencement of the development, the applicant shall submit for approval to the LPA details indicating how additional surface water run-off from the site will be avoided during the construction phase. The applicant may be required to provide collection, balancing and/or settlement systems for these flows. The approved system shall be operating to the satisfaction of the LPA, before the commencement of any works, which would lead to increased surface water run-off from site during the construction phase.

 

Highways

 

8.  No development shall take place until a Construction Management Plan or Construction Method Statement (CMP/CMS) has been submitted to and been approved in writing by the Local Planning Authority. The approved plan/statement shall be adhered to throughout the construction period. The statement shall provide for:

 

-    parking of vehicles of site operatives and visitors

-    routes for construction traffic

-    swept paths for construction vehicles expected to enter the site (largest vehicle to be demonstrated)

-    hours of operation

-    method of prevention of debris being carried onto highway

-    pedestrian and cyclist protection

-    proposed temporary traffic restrictions

-    arrangements for turning vehicles

 

9.  Throughout the period of development vehicle wheel cleaning facilities shall be provided and retained within the site. All construction vehicles shall have their wheels cleaned before leaving the site in order to prevent the deposition of mud and other extraneous material on the public highway.

 

10. Prior to works commencing, details of the tie in between the existing footway on Ashgate Road and the footway into the site shall be submitted and approved in writing.  Thereafter, the works shall be carried out in accordance with the approved details.

 

11. The development hereby permitted shall not be occupied until the cycle parking facilities shown on the approved drawings have been implemented and made available for use.  The cycle parking facilities shall thereafter be retained for use by the occupants of, and visitors to, the development at all times.

 

12. There shall be no gates or other barriers on the access unless otherwise agreed in writing by the Local Planning Authority.

 

13. No building or use hereby permitted shall be occupied or the use commenced until the car/vehicle parking and manoeuvring areas shown on the approved drawing have been completed surfaced and demarcated, and thereafter, the area shall be kept free of obstruction and available for the parking of vehicles associated with the development.  Manoeuvring shall include vehicles associated with the allotments.

 

Land Condition

 

14. Development shall not commence until the results and conclusions of the intrusive site investigations already undertaken have been considered; and a scheme of remediation and mitigation has been prepared and submitted to the Local Planning Authority for consideration and written approval.  Only those details which receive the written approval of the Local Planning Authority shall be carried out on site.

 

Ecology

 

15. Prior to the installation of any external lighting a detailed lighting strategy shall be submitted to and approved in writing by the LPA. Such approved measures must be implemented in full and maintained thereafter. 

 

This is to ensure that a sensitive lighting strategy is designed in line with guidance within Paragraph 180 of the NPPF.

 

16. Prior to the commencement of development a biodiversity/ecological enhancement strategy that includes the provision of integral bird and bat boxes within the building and native landscaping (broadly in accordance with the Landscaping Strategy submitted and the further details required in connection with condition 17 below) should be submitted to and approved in writing by the Council.  Such approved measures should be implemented in full.

 

Landscaping

 

17. Within 2 months of commencement of development, unless otherwise agreed in writing by the Local Planning Authority, details of a soft landscaping scheme for the approved development shall be submitted to the Local Planning Authority for consideration.

 

The required soft landscape scheme shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers; densities where appropriate, an implementation programme and a schedule of landscape maintenance for a minimum period of five years. Those details, or any approved amendments to those details shall be carried out in accordance with the implementation programme.

 

18. If, within a period of five years from the date of the planting of any tree or plant, that tree or plant, or any tree or plant planted as a replacement for it, is removed, uprooted or destroyed or dies, or becomes, in the opinion of the Local Planning Authority, seriously damaged or defective, another tree or plant of the same species and size as that originally planted shall be planted at the same place, unless the Local Planning Authority gives its written consent to any variation.

 

19. Within 2 months of commencement of development, unless otherwise agreed in writing by the Local Planning Authority, full details of hard landscape works for the approved development shall be submitted to the Local Planning Authority for consideration.

 

Hard landscaping includes proposed finished land levels or contours; means of enclosure (boundary treatments/fences/railings); minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting etc.) retained historic landscape features and proposals for restoration, where relevant. These works shall be carried out as approved prior to the occupation of the building. 

 

20. Prior to commencement of development tree protection measures shall be erected as outlined in the Tree Protection Plan (Figure 02.01) in accordance with the specification detailed at Appendix E of the Arboricultural Impact Assessment by RPS Group.  Throughout site clearance and construction phases the measures outlined therein shall be adhered to at all times unless otherwise agreed in writing by the Local Planning Authority. 

 

21. Prior to commencement of development an Arboricultural Method Statement (AMS) shall be shall be submitted to the Local Planning Authority for consideration and written approval detailing a full specification for:

 

-  the installation of boundary treatments within the designated root protection areas;

 

-    the details of construction of any roads, parking areas and driveways within the designated root protection areas;

 

-    details of construction and changes in level within the RPA or that may impact on the retained trees T17 Maple & T18 Alder; and

 

-    details of the no-dig specification and extent of the areas of the roads, parking areas and driveways to be constructed using a no-dig specification and shall include relevant sections through them.

 

The development thereafter shall be implemented in strict accordance with the approved details.

 

Percent for Art

 

22. Upon commencement of development and prior to its installation further details of the proposed reinstatement of the former Drill Hall decorative archway to the central gable of the Ashgate Gate elevation shall be submitted to the Local Planning Authority for approval and consideration.  Those details shall include a schedule of component parts, details of any necessary renovation/cleaning of those parts and the means of their fixture/incorporation into the external fabric of the new building (inc. cross sections). 

 

Only the approved details shall be installed on site in accordance with the approved scheme.  The approved artwork installed on site shall be retained in situ as such for the life of the development.

 

Local Labour

 

23. Prior to development commencing an Employment and Training Scheme shall be submitted to the Local Planning Authority for consideration and written approval.  The Scheme shall include a strategy to promote local supply chain, employment and training opportunities throughout the construction of the development.

 

Others

 

24. Construction work (inc. any site clearance and demolition works) shall only be carried out on site between 8:00am and 6:00pm Monday to Friday, 9:00am to 5:00pm on a Saturday and no work on a Sunday or Public Holiday.  The term "work" will also apply to the operation of plant, machinery and equipment.

 

25. Before construction works commence or ordering of external materials takes place, precise specifications or samples of the walling and roofing materials to be used shall be submitted to the Local Planning Authority for consideration. Only those materials approved in writing by the Local Planning Authority shall be used as part of the development.

 

26. Electric Vehicle Charging Points (EVCPs) shall be provided in accordance with the approved site layout for at least 2 no. car parking spaces; and passive provision shall be made available for the remainder of the site so that spaces are capable of being readily converted to EVCPs in the future.  Thereafter the EVCP’s shall be retained and maintained operational for the lifetime of the development. 

 

CHE/19/00418/FUL - ERECTION OF LOG CABIN FOR USE AS A SEPARATE ANNEXE FOR FAMILY MEMBERS AT 15 LAUREL CRESCENT, HOLLINGWOOD, DERBYSHIRE S43 2LA

 

That the officer recommendation be upheld and the application be approved subject to the following conditions:-

 

(A) 1.  The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

2.  The development hereby approved shall only be carried out in full accordance with the approved plans (listed below) with the exception of any approved non material amendment.

 

Un-numbered drawings:-

 

1/1250 Location Plan;

1/500 scale Site Plan;

1/500 scale Block Plan;

Log Cabin - Specifications;

Log Cabin - Floor Plans, and

ARDEE Log Cabin - Details.

 

3.  No development above floor-slab/D.P.C level shall be carried out until the precise specifications or samples of the walling and roofing materials to be used shall be submitted to and approved in writing by the Local Planning Authority. Only those materials approved in writing by the Local Planning Authority shall be used as part of the development.

 

4.  The site shall be developed with separate systems of drainage for foul and surface water on and off site.

 

5.  There shall be no piped discharge of surface water from the development prior to the completion of surface water drainage works, details of which will have been submitted to and approved by the Local Planning Authority. If discharge to public sewer is proposed, the information shall include, but not be exclusive to i) evidence that other means of surface water drainage have been properly considered and why they have been discounted; and ii) the means by which the discharge rate shall be restricted to a maximum rate of 3.5 litres per second.

 

6.  Notwithstanding the provision of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) there shall be no extensions, outbuildings or alterations to the roof of the annex hereby approved without the prior written agreement of the Local Planning Authority.

 

7.  The self-contained accommodation hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential use of the dwelling on the application site, presently known as 15 Laurel Crescent, Hollingwood in that it shall: -

 

-    only be occupied by persons with a familial link or demonstrable relationship to the occupants of the main dwelling;

-    not be identified or addressed as a separate postal address;

-    not be occupied in the event the main dwelling is unoccupied; and

-    not be occupied under any form of contract.

 

(B) That a CIL Liability notice be served for £2,878 as detailed in section 5.7 of the officer’s report.