Minutes:
The Committee considered the under-mentioned applications in light of reports by the Development Management and Conservation Manager and resolved as follows:-
CHE/22/00194/FUL - CHANGE OF USE OF EXISTING BUILDING TO CREATE 42 RESIDENTIAL APARTMENTS (USE CLASS C3) AND ASSOCIATED EXTERNAL ALTERATIONS AT BURLINGTON HOUSE, BURLINGTON STREET, CHESTERFIELD FOR G.A.P.E EQUITY LIMITED.
*RESOLVED –
1.
The development hereby permitted shall be begun
before the expiration of three years from the date of this
permission.
2. The development hereby approved shall only be carried out in full accordance with the approved plans (listed below) with the exception of any approved non-material amendment and condition requirements listed below. All external dimensions and elevational treatments shall be as shown on the approved plan/s (listed below).
- Proposed rear and side elevations, site and block plan 1068 008 Rev M received 13.06.2022
- Proposed front and side elevations, site and block plan 1068 007 Rev I received 13.06.2022
- Proposed ground floor and site layout plan 1068 003 Rev C received 23.06.2022
- Proposed roof plan 1068 011 received 21.03.2022
- Location plan 1068 012 Rev B received 07.04.2022
3. No individual dwelling hereby approved shall be occupied until the optional requirement for water consumption (110 litres use per person per day) in Part G of the Building Regulations has been complied with for that dwelling.
4. Within 28 days of the commencement of development, a Biodiversity Enhancement Plan (including a programme of implementation and maintenance) shall be submitted to and approved in writing by the Local Planning Authority. The enhancement plan shall be implemented, retained and maintained thereafter in accordance with the scheme and programme so approved. Photographs of the measures in situ shall submitted to the LPA to validate the provision prior to final occupation.
5. Prior to the commencement of development, the lift from the ground to the first and second floors shall be installed and be fully operational prior to first occupation of the first or second floor accommodation hereby approved.
6.
Prior to first occupation details of:
1.
A communal door specification and entry schedule to
an agreed third party certified security level, including
audio/visual verification.
2.
CCTV provision for the lobby and communal areas of
the building
3.
Cycle storage numbers and specification
4.
Post box specification to an agreed third party
certified security standard (ideally the Door and Hardware
Federation Technical spec TS00,
5. Shall be submitted to and agreed in writing by the Local Planning Authority. The details shall be fully installed prior to first occupation and maintained thereafter.
7. Prior to first occupation a detailed tenure and property management and maintenance plan shall be submitted to and agreed in writing by the Local Planning Authority. The property shall be managed in accordance with the agreed details.
8. Notwithstanding the submitted materials plan, details including samples of all facing materials; including windows, doors, entrance feature, balcony finishes and brise soleil; along with details of junctions with existing features of the building and junctions between materials, shall be submitted to and agreed in writing by the Local Planning Authority prior to being installed on the building. Work shall be completed in accordance with the agreed details prior to the first occupation of any apartment to the first, second or first floor of the building.
9. Prior to the commencement of development, a sustainability statement shall be submitted to and agreed in writing by the Local Planning Authority detailing; demonstration (without pre-registration) compliance with the June 2022 building regulations in terms of building fabric and heating systems, along with a statement on how emissions will be reduced through the construction process. Works shall be completed in accordance with the agreed statement.
10.
No development shall commence until a Highway
Construction Management Statement / Plan has been submitted to and
approved in writing by the Local Planning Authority. The statement
/ plan shall include details specifically relating to:
a.
parking for vehicles of site personnel, operatives
and visitors
b.
site accommodation
c.
storage of plant and materials
d.
routes for construction traffic to and from the site
and measures to ensure adherence to the approved routing plan for
vehicles under the applicants / developer’s control
e.
provision of roadside boundary hoarding behind any
visibility zones
f.
any proposed temporary traffic management.
g. measures to minimise mud and dust arising from the site works, including wheel washing.
Only the approved details shall be implemented, which shall be maintained throughout the construction period.
11. Prior to development commencing, an Employment and Training Scheme shall be submitted to the Local Planning Authority for consideration and written approval. The Scheme shall include a strategy to promote local supply chain, employment and training opportunities throughout the construction of the development.
12. Following completion of at
least 50% of the dwellings and secondly at the stage of the final
completion of the remaining 50% of the dwellings, a post
construction Accessible Housing Certification Table containing the
full details of the following matters shall be submitted to and
approved in writing by the Local Planning Authority;
-
Which and how many dwellings within the development
have satisfied M4 (2)* accessible and adaptable dwellings
standards
-
Which and how many dwellings within the development
have satisfied M4 (3)* wheelchair adaptable dwellings
standards
- Which and how many dwellings within the development have satisfied M4 (3)* wheelchair accessible dwellings standard. *contained within Part M Volume 1 (Approved Document) of The Building Regulations 2010, or any such Approved Document or Regulations for the time being in force, including any modification, extension or re-enactment of the same and including all instruments, orders, regulations and directions for the time being made, issued or given under the Approved Document or Regulations (or deriving validity from the same).
The accessible dwellings shall be provided in accordance with the agreed details and shall be retained as provided for thereafter.
13. Prior to the development hereby permitted being occupied/brought into use glazed screens located between the balconies shall be installed with obscure glazing which shall be obscured to a minimum of Pilkington - Privacy Level 3 or an equivalent product. Once installed the glazing shall be retained as such thereafter.
14. No construction or demolition works, movement of construction traffic, or deliveries to and from the premises, shall occur other than between 0800 and 1800 hours weekdays, and 0800 and 1300 hours on Saturdays, and at no time on Sundays or Public Holidays.
15. Prior to first occupation of either the first or second floor of the premises a scheme for the provision of the outdoor amenity space to the roof top area shall be submitted to and agreed in writing by the Local Planning Authority, the approved scheme for the outdoor amenity space shall be made available for use prior to first occupation and retained for use in perpetuity.
B. That a CIL liability notice be served for £156,202, as per section 5.14 of the officer’s report.
CHE/22/00195/FUL - ERECTION OF THIRD STOREY TO CREATE 13 NO. RESIDENTIAL APARTMENTS (USE CLASS C3) AT BURLINGTON HOUSE, BURLINGTON STREET, CHESTERFIELD FOR G.A.P.E EQUITY LIMITED.
*RESOLVED –
That the officer recommendation be upheld and the application be approved subject to the following conditions:-
A.
1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
2. The development hereby approved shall only be carried out in full accordance with the approved plans (listed below) with the exception of any approved non-material amendment and condition requirements listed below. All external dimensions and elevational treatments shall be as shown on the approved plan/s (listed below).
- Proposed rear and side elevations, site and block plan 1068 008 Rev M received 13.06.2022
- Proposed front and side elevations, site and block plan 1068 007 Rev I received 13.06.2022
- Proposed third floor plan 1068 006 Rev F received 13.06.2022
- Proposed roof plan 1068 011 received 21.03.2022
- Proposed ground floor and site layout plan 1068 003 Rev C received 23.06.2022
- Location plan 1068 012 Rev B received 07.04.2022
3. No individual dwelling hereby approved shall be occupied until the optional requirement for water consumption (110 litres use per person per day) in Part G of the Building Regulations has been complied with for that dwelling.
4. Within 28 days of the commencement of development, a Biodiversity Enhancement Plan (including a programme of implementation and maintenance) shall be submitted to and approved in writing by the Local Planning Authority. The enhancement plan shall be implemented, retained and maintained thereafter in accordance with the scheme and programme so approved. Photographs of the measures in situ shall submitted to the LPA to validate the provision prior to final occupation.
5.
Prior to first occupation details of:
1.
A communal door specification and entry schedule to
an agreed third party certified security level, including
audio/visual verification.
2.
CCTV provision for the lobby and communal areas of
the building
3.
Cycle storage numbers and specification
4. Post box specification to an agreed third party certified security standard (ideally the Door and Hardware Federation Technical spec TS00, shall be submitted to and agreed in writing by the Local Planning Authority. The details shall be fully installed prior to first occupation and maintained thereafter.
6. Prior to first occupation a detailed tenure and property management and maintenance plan shall be submitted to and agreed in writing by the Local Planning Authority. The property shall be managed in accordance with the agreed details.
7. Notwithstanding the submitted materials plan, details including samples of all facing materials; including windows, doors, balcony finishes and details of junctions with existing features of the building and junctions between materials, shall be submitted to and agreed in writing by the Local Planning Authority. Work shall be completed in accordance with the agreed details prior to the first occupation of any apartment to the first, second or first floor of the building.
8. Prior to the commencement of development, a sustainability statement shall be submitted to and agreed in writing by the Local Planning Authority detailing; demonstration (without pre-registration) compliance with the June 2022 building regulations in terms of building fabric and heating systems, along with a statement on how emissions will be reduced through the construction process. Works shall be completed in accordance with the agreed statement.
9.
No development shall commence until a Highway
Construction Management Statement / Plan has been submitted to and
approved in writing by the Local Planning Authority. The statement
/ plan shall include details specifically relating to:
a.
parking for vehicles of site personnel, operatives
and visitors
b.
site accommodation
c.
storage of plant and materials
d.
routes for construction traffic to and from the site
and measures to ensure adherence to the approved routing plan for
vehicles under the applicants / developers control
e.
provision of roadside boundary hoarding behind any
visibility zones
f.
any proposed temporary traffic management.
g. measures to minimise mud and dust arising from the site works, including wheel washing.
Only the approved details shall be implemented, which shall be maintained throughout the construction period.
10. Prior to development commencing, an Employment and Training Scheme shall be submitted to the Local Planning Authority for consideration and written approval. The Scheme shall include a strategy to promote local supply chain, employment and training opportunities throughout the construction of the development.
11. Prior to the development hereby permitted being occupied/brought into use glazed screens located between the balconies shall be installed with obscure glazing which shall be obscured to a minimum of Pilkington - Privacy Level 3 or an equivalent product. Once installed the glazing shall be retained as such thereafter.
12. No construction or demolition works, movement of construction traffic, or deliveries to and from the premises, shall occur other than between 0800 and 1800 hours weekdays, and 0800 and 1300 hours on Saturdays, and at no time on Sundays or Public Holidays.
B. That a CIL liability notice be served for £48,077, as per section 5.14 of the officer’s report.
*RESOLVED –
A.
1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
2. The development hereby approved shall only be carried out in full accordance with the approved plans (listed below) with the exception of any approved non-material amendment. All external dimensions and elevational treatments shall be as shown on the approved plan/s (listed below).
- Proposed site layout 21015-70-001_P13 received 30.06.22
- Swept Path analysis 600357-HEX-00-00-DR-TP-0104 P02 received 13.06.22
- House types:
- B2.3 A 21015-020-004_P2 received 20.04.22
- B2.3 B 21015-020-013 received 20.04.22
- H2.4 A 21015-020-002_P2 received 20.04.22
- H2.4 B 21015-020-007 received 20.04.22
- H2.4 C 21015-020-008 received 20.04.22
- H3.5 A 21015-020-003_P2 received 20.04.22
- H3.5 B and H3.5 C21015-020-010 received 20.04.22
- H3.5 C and H3.5 D 21015-020-009 received 20.04.22
- H3.5 E 21015-020-011 received 20.04.22
- H3.5 F 21015-020-01 received 20.04.22
3.
a. No development shall take place until a Written Scheme of Investigation for archaeological work has been submitted to and approved by the local planning authority in writing, and until any pre-start element of the approved scheme has been completed to the written satisfaction of the local planning authority. The scheme shall include an assessment of significance and research questions; and
1.
The programme and methodology of site investigation
and recording
2.
The programme for post investigation
assessment
3.
Provision to be made for analysis of the site
investigation and recording
4.
Provision to be made for publication and
dissemination of the analysis and records of the site
investigation
5.
Provision to be made for archive deposition of the
analysis and records of the site investigation
6. Nomination of a competent person or persons/organization to undertake the works set out within the Written Scheme of Investigation
b. No development shall take place other than in accordance with the archaeological Written Scheme of Investigation approved under condition (a).
c. The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the archaeological Written Scheme of Investigation approved under condition (a) and the provision to be made for analysis, publication and dissemination of results and archive deposition has been secured.
4.
Prior to the commencement of the development hereby
approved (including demolition and all preparatory work), a scheme
for the protection of the retained trees, in accordance with BS
5837:2012, including a tree protection plan(s) (TPP) and an
arboricultural method statement (AMS) shall be submitted to and
approved in writing by the Local Planning Authority. Specific
issues to be dealt with in the TPP and AMS:
a)
Location and installation of services/ utilities/
drainage.
b)
Details of construction within the RPA or that may
impact on the retained trees.
c)
a full specification for the installation of
boundary treatment works within the designated root protection
areas.
d)
a full specification for the construction of any
roads, parking areas and driveways, including details of the no-dig
specification and extent of the areas of the roads, parking areas
and driveways to be constructed using a no-dig specification.
Details shall include relevant sections through them.
e)
Detailed levels and cross-sections to show that the
raised levels of surfacing, where the installation of no-dig
surfacing within Root Protection Areas is proposed, demonstrating
that they can be accommodated where they meet with any adjacent
building damp proof courses.
f)
A specification for protective fencing to safeguard
trees during both demolition and construction phases and a plan
indicating the alignment of the protective fencing.
g)
a specification for scaffolding and ground
protection within tree protection zones.
h)
Tree protection during construction indicated on a
TPP and construction and construction activities clearly identified
as prohibited in this area.
i)
details of site access, temporary parking, on site
welfare facilities, loading, unloading and storage of equipment,
materials, fuels and waste as well concrete mixing and use of
fires
j) Methods to improve the rooting environment for retained and proposed trees and landscaping, due to the use of heavy machinery around the retained trees and the compaction to the rooting environment that this may have caused.
The development thereafter shall be implemented in strict accordance with the approved details.
5.
Prior to completion or first occupation of the
development hereby approved, whichever is the sooner; details of
treatment of all parts on the site not covered by buildings shall
be submitted to and approved in writing by the Local Planning
Authority. The site shall be landscaped strictly in accordance with
the approved details in the first planting season after completion
or first occupation of the development, whichever is the sooner.
Details shall include:
a)
a scaled plan showing vegetation to be retained and
trees and plants to be planted:
b)
proposed hardstanding and boundary treatments that
shall be suitable for hedgehog routes (with existing residents
boundaries retained and enhanced)
c)
a schedule detailing sizes and numbers of all
proposed trees/plants
d) Sufficient specification to ensure successful establishment and survival of new planting.
Any new tree(s) that die(s), are/is removed, become(s) severely damaged or diseased shall be replaced and any new planting (other than trees) which dies, is removed, becomes severely damaged or diseased within five years of planting shall be replaced. Replacement planting shall be in accordance with the approved details (unless the Local Planning Authority gives its written consent to any variation).
6.
A Landscape and Ecological Management Plan (LEMP)
shall be submitted to and approved in writing by the Local Planning
Authority prior to the occupation of the development. The LEMP
shall cover all retained and created habitats, as identified in the
agreed Biodiversity Net Gain Feasibility Assessment report to meet
the habitat gains set out in the Biodiversity metric calculation
and landscaping of the site agreed under condition 5 above.
The content of the LEMP shall include the following;
a)
Description and evaluation of features to be
managed;
b)
Ecological trends and constraints on site that might
influence management;
c)
Aims and objectives of management;
d)
Appropriate management options for achieving aims
and objectives;
e)
Prescriptions for management actions;
f)
Preparation of a work schedule (including an annual
work plan capable of being rolled forward over a thirty-year
period);
g)
Details of the body or organization responsible for
implementation of the plan;
h)
Ongoing monitoring and remedial measures,
i) Details of the company to be set up to manage the any private highways areas and the landscaped areas of the site in perpetuity,
The LEMP shall also include details of the legal and funding
mechanism(s) by which the long-term (30 Years +) implementation of
the plan will be secured by the developer with the management
body(ies) responsible for its delivery. The plan shall also set out
(where the results from monitoring show that conservation aims and
objectives of the LEMP are not being met) how contingencies and/or
remedial action will be identified, agreed and implemented so that
the development still delivers the fully functioning biodiversity
objectives of the originally approved scheme. The approved plan
shall be implemented in accordance with the approved
details.
7. Throughout the period of development vehicle wheel cleaning facilities shall be provided and retained within the site. All construction vehicles shall have their wheels cleaned before leaving the site in order to prevent the deposition of mud and other extraneous material on the public highway.
8. No development shall take place until full construction details of the residential estate road and footways including layout (generally in accordance with approved application drawings), levels, gradients, surfacing and means of surface water drainage, have been submitted to and approved in writing by the Local Planning Authority. The development shall, thereafter be constructed in accordance with the approved details unless otherwise agree in writing by the Local Planning Authority.
9. The carriageway and footways agreed under condition 8 above, shall be constructed up to and including base course surfacing to ensure that each dwelling has a properly consolidated and surfaced carriageway and footway, between the dwelling and the existing highway prior to occupation. Until final surfacing is completed, the footway base course shall be provided in a manner to avoid any upstands to gullies, covers, kerbs or other such obstructions within or abutting the footway. The carriageways, footways and footpaths in front of each dwelling shall be completed with final surface course within twelve months (or three months in the case of a shared surface road) from the occupation of such dwelling, unless otherwise agreed in writing by the Local Planning Authority.
10. Prior to the commencement of the development details shall be submitted to and approved in writing by the Local Planning Authority showing the means to prevent the discharge of water from the drives/accesses/shared drives onto the proposed adopted highway. The approved scheme shall be undertaken and completed prior to the first use of the access and retained as such thereafter.
11. No development shall be commenced until details of the proposed arrangements for future management and maintenance of the proposed streets within the development have been submitted to and approved by the local planning authority. The streets shall thereafter be maintained in accordance with the approved management and maintenance details until such time as an agreement has been entered into under section 38 of the Highways Act 1980 or a private management and maintenance company has been established as appropriate.
12. No dwelling shall be occupied until access has been formed to the new estate street, unless otherwise agreed in writing by the Local Planning Authority, provided with 2m x 25m visibility sightlines, the areas in advance maintained free from any objects exceeding 1m in height (600mm if vegetation) relative to the adjacent carriageway channel level.
13. No dwelling shall be occupied until space has been laid out within the site in accordance with the approved application drawings for parking and manoeuvring of residents/ visitors/ service and delivery vehicles, laid out, surfaced and maintained throughout the life of the development free from any impediment to its designated use.
14. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or in any Statutory Instrument revoking or re-enacting that Order with or without modification) no fences, gates, walls or other means of enclosure shall be erected along the highway frontage of any dwelling without the prior written approval of the Local Planning Authority upon an application submitted to it.
15. The proposed driveways shall be no steeper than 1:12 and shall be constructed of a solid bound material.
16. No individual dwelling hereby approved shall be occupied until the optional requirement for water consumption (110 litres use per person per day) in Part G of the Building Regulations has been complied with for that dwelling.
17. Prior to development commencing, an Employment and Training Scheme shall be submitted to the Local Planning Authority for consideration and written approval. The Scheme shall include a strategy to promote local supply chain, employment and training opportunities throughout the construction of the development.
18. Prior to any demolition, construction or contaminated land remediation works commence in connection with each identified phase, a Construction Environmental Management Plan (CEMP) shall be submitted to, and approved in writing by, the Local Planning Authority detailing the provisions to be made for the monitoring and control of:
a)
Operating hours: No
demolition, construction or contaminated land remediation
activities, movement of traffic, or deliveries to and from the
premises, shall occur other
b)
Monday to Friday: 08:00 – 18:00
c)
Saturday: 08:00 – 13:00
d)
Sundays and bank Holidays - No working
e)
Noise and vibration: To
demonstrate compliance with the guidance in British Standard BS5228
Noise and vibration control on construction and open sites;
including the proposed measurement methodology, the location of
monitoring locations and noise-sensitive premises, the maximum
permitted facade noise levels. No
piling, blasting, dynamic compaction or use of vibrating rollers
shall occur without the written approval of the Local Planning
Authority;
f)
Dust/Particulate emissions: To include the prevention of dust/particulates
being blown off-site. At such times as
the prevention of dust/particulate nuisance by the agreed means is
not possible, the movement of vehicles, soils or dusty materials
must temporarily cease until such time as weather conditions
improve;
g)
Waste: To include
suitable and sufficient provisions for the collection, storage and
disposal of waste materials. No
unwanted materials shall be disposed of on site by burning without
the prior written approval of the Local Planning
Authority;
h) Lighting: To include a site plan showing the proposed types, locations and heights of the lamps, vertical illuminance levels (Lux) to the facades of agreed light-sensitive premises and operating times.
All works shall be fully implemented in accordance with the approved CEMP. The CEMP shall be reviewed at least at the start of each phase of the development or where there are changes to relevant legislation or where changes are made to the agreed CEMP.
19. The development shall be constructed in line with the sustainability statement dated 15th July 2022.
20. The site shall be developed with separate systems of drainage for foul and surface water on and off site. The separate systems should extend to the points of discharge to be agreed.
21.
There shall be no piped discharge of surface water
from the development prior to the completion of surface water
drainage works, details of which will have been submitted to and
approved by the Local Planning Authority. If discharge to public
sewer is proposed, the information shall include, but not be
exclusive to:
i) the means of discharging to the public sewer network at a rate
not to exceed 3.5 litres per second
22. No building or other obstruction including landscape features shall be located over or within 3 metres either side of the centre line of the public sewer i.e. a protected strip width of 6 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken.
23. Prior to the commencement of development a detailed methodology for site clearance shall be submitted to and agreed in writing by the Local Planning Authority. The agreed methodology shall be followed through all site clearance works.
24. Prior any external lighting installation a lighting scheme shall be submitted to and approved in writing by the Local Planning Authority to ensure that wildlife implications are fully taken into account (including the need for reduced or no lighting in the more sensitive locations and directions; specifically, towards the railway line). The agreed lighting scheme shall be fully installed in accordance with the approved scheme prior to last occupation.
25. Prior to works commencing above slab level a scheme for the incorporation of bat and bird boxes within the development shall be submitted to and agreed in writing by the Local Planning Authority. Such a scheme shall provide precise details of the number, range and location of boxes. The boxes shall be fully installed and maintained thereafter in accordance with the agreed scheme.
26. Details including samples where necessary of all materials to be used in the construction of the external surfaces of the proposed development shall be submitted to and approved in writing by the Local Planning Authority before any work to any external surface is carried out. The development shall thereafter be constructed in accordance with the approved details.
27.
Following completion of 50% of the dwellings and
secondly at the stage of the final completion of the remaining 50%
of the dwellings, a post construction Accessible Housing
Certification Table containing the full details of the following
matters shall be submitted to and approved in writing by the Local
Planning Authority;
-
Which and how many dwellings within the development
have satisfied M4 (2)* accessible and adaptable dwellings
standards
-
Which and how many dwellings within the development
have satisfied M4 (3)* wheelchair adaptable dwellings
standards
-
Which and how many dwellings within the development
have satisfied M4 (3)* wheelchair accessible dwellings standard.
(*contained within Part M Volume 1 (Approved Document) of The
Building Regulations 2010, or any such Approved Document or
Regulations for the time being in force, including any
modification, extension or re-enactment of the same and including
all instruments, orders, regulations and directions for the time
being made, issued or given under the Approved Document or
Regulations (or deriving validity from the same.))
The accessible dwellings shall be provided in accordance with the agreed details and shall be retained as provided for thereafter.
28. Prior to works commencing beyond the entrance access works, a scheme detailing all proposed finished floor and land levels shall be submitted to and approved in writing by the Local Planning Authority prior to any importation of earth to site or excavation works commencing. The development shall be carried out in accordance with the approved scheme unless the Local Planning Authority gives its written consent to any variation.
29.
No development shall take place until a detailed
design and associated management and maintenance plan of the
surface water drainage for the site, in accordance with the
principles outlined within:
a.
Drawings Hexa Consulting (21/12/2021). Drainage
Layout Sheet 1, 600357-HEX-XXZZ-DR-C-9201, Revision P02 and Hexa
Consulting (21/12/2021). Drainage Layout Sheet 2,
600357-HEX-XX-ZZ-DR-C-9202, Revision P02; and letters Wojnowska, A.
2022. Letter to Jo Crawshaw-Moore, 600357/AW, 27 June
and Wojnowska, A. 2022. Letter to Jo
Crawshaw-Moore, 600357/AW, 6 July; including any subsequent
amendments or updates to those documents as approved by the Flood
Risk Management Team
b. And DEFRA’s Non-statutory technical standards for sustainable drainage systems (March 2015), have been submitted to and approved in writing by the Local Planning Authority.
30. Prior to commencement of the development, the applicant shall submit for approval to the LPA details indicating how additional surface water run-off from the site will be avoided during the construction phase. The applicant may be required to provide collection, balancing and/or settlement systems for these flows. The approved system shall be operating to the satisfaction of the LPA, before the commencement of any works, which would lead to increased surface water run-off from site during the construction phase.
31. Prior to the first occupation of the development, a verification report carried out by a qualified drainage engineer must be submitted to and approved by the Local Planning Authority. This must demonstrate that the drainage system has been constructed as per the agreed scheme (or detail any minor variations), provide the details of any management company and state the national grid reference of any key drainage elements (surface water attenuation devices/areas, flow restriction devices and outfalls).
32. Prior to the commencement of development a statement setting out how emissions will be reduced though the construction process shall be submitted to and agreed in writing by the Local Planning Authority. Works shall be completed in accordance with the agreed details.
33. A residential charging point shall be provided for each new dwelling with an IP65 rated domestic 13amp socket, directly wired to the consumer unit with 32 amp cable to an appropriate RCD. The socket shall be located where it can later be changed to a 32amp EVCP. Alternative provision to this specification must be approved in writing, by the local planning authority. The electric vehicle charging points shall be provided in accordance with the stated criteria prior to occupation and shall be maintained for the life of the approved development.
B. That a CIL liability notice be served for £128,592, as per section 5.13 of the officer’s report.
CHE/22/00139/FUL - ALTERATIONS TO EXISTING BUNGALOW TO INCLUDE REAR DORMER AND SINGLE STOREY REAR EXTENSION (REVISED PANS RECEIVED 21/04/2022 AND 06/06/2022) (DESCRIPTION OF DEVELOPMENT UPDATED 22/04/2022 AND 10/06/2022) AT 26 WESTWOOD LANE, BRIMINGTON, CHESTERFIELD, S43 1PA FOR MR S BINNS.
*RESOLVED –
1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
2. The development hereby permitted shall only be carried out in full accordance with the approved plans (listed below) with the exception of any approved non-material amendment. All external dimensions and elevational treatments shall be as shown on the approved plan/s (listed below):
- Site location and layout plan, Drawing no. 008, A2, dated May 2022
- Proposed elevations, Drawing no. 007, 1:100 @ A3, dated May 2022
- Proposed roof plan, Drawing no. 006, 1: 50 @ A3, dated May 2022
- Proposed ground floor plan, Drawing no. 004, 1:50 @ A3, dated May 2022
- Proposed first floor plan, Drawing no. 005, 1:50 @ A3, dated May 2022
Supporting documents: