Applications for Planning Permission - Plans Determined by the Committee PDF 99 KB Additional documents:
Minutes: *The Committee considered the under-mentioned applications in light of reports by the Development Management and Conservation Manager and resolved as follows:-
CHE/21/00801/FUL & CHE/21/00802/LBC - REFURBISHMENT, ALTERATION AND EXTENSION OF THE GRADE II LISTED STEPHENSON MEMORIAL HALL – POMEGRANATE THEATRE, MUSEUM & ART GALLERY – TO CREATE AN INTEGRATED CULTURAL CENTRE THROUGH THE INTERGRATION OF THE EXISTING THEATRE AUDITORIUM AND MUSEUM SPACES AT CORPORATION STREET, CHESTERFIELD FOR BAUMAN LYONS ARCHITECTS obo CHESTERFIELD BOROUGH COUNCIL.
In accordance with Minute No. 299 (2001/2002) Mrs Janet Murphy (objector), Mr John Dickinson (representations on the proposals), and Councillor Sarvent (Cabinet Member for Town Centres and Visitor Economy) addressed the meeting. Mr Simon Maddy (applicant’s architect) and Mr Anthony Radford (applicant Cultural Services Manager) answered questions from the committee.
That the officer recommendation be upheld and the applications be approved subject to the following conditions:-
CHE/21/00801/FUL
1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
2. The development hereby approved shall only be carried out in full accordance with the approved plans (listed below) with the exception of any approved non material amendment. All external dimensions and elevational treatments shall be as shown on the approved plan/s (listed below).
SMH-BLA-A-DR-ZZ-ZZ-001-P01-1:1250 Location Plan SMH-BLA-A-DR-ZZ-ZZ-002-P01-1:200 Existing Site Plan SMH-BLA-A-DR-ZZ-ZZ-100-P01-1:200 Proposed Site Plan SMH-BLA-A-DR-NA-LG-015-P02-Lower Ground GA Existing SMH-BLA-A-DR-NA-UG-016-P02-Upper Ground GA Existing SMH-BLA-A-DR-NA-01-017-P02-First Floor Mezzanine GA Existing SMH-BLA-A-DR-NA-02-018-P02-Second Floor GA Existing SMH-BLA-A-DR-NA-RF-020-P01-Roof Plan Existing SMH-BLA-A-DR-NA-03-019-P02-Grid Floor GA Existing SMH-BLA-A-DR-NA-RF-025-P02-Lower Ground Interventions SMH-BLA-A-DR-NA-RF-026-P02-Upper Ground Interventions SMH-BLA-A-DR-NA-01-027-P02-First Floor Mezzanine Interventions SMH-BLA-A-DR-NA-01-028-P02-Second Floor Interventions SMH-BLA-A-DR-NA-01-030-P02-Roof Floor Interventions SMH-BLA-A-DR-ZZ-ZZ-035-P01-Existing North Elevation SMH-BLA-A-DR-ZZ-ZZ-036-P01-Existing East and West Elevations SMH-BLA-A-DR-ZZ-ZZ-037-P01-Existing South Elevation SMH-BLA-A-DR-ZZ-ZZ-040-P01-North Elevation - Fabric Repairs SMH-BLA-A-DR-ZZ-ZZ-041-P01-East and West Elevations - Fabric Repairs SMH-BLA-A-DR-ZZ-ZZ-042-P01-South Elevation - Fabric Repairs SMH-BLA-A-DR-ZZ-ZZ-050-P01-S-01 Corporation Street Section SMH-BLA-A-DR-ZZ-ZZ-051-P01-S-02 Auditorium Long Section SMH-BLA-A-DR-SMG-ZZ-053-P01-S-A-St Mary’s Gate Section SMH-BLA-A-DR-ZZ-ZZ-055-P01- S-C-Auditorium Short Section SMH-BLA-A-DR-NA-LG-110-P08-Lower Ground GA Proposed SMH-BLA-A-DR-NA-UG-111-P09-Upper Ground GA Proposed SMH-BLA-A-DR-NA-01-112-P09-First Floor Mezzanine GA Proposed SMH-BLA-A-DR-NA-02-113-P08-Second Floor GA Proposed SMH-BLA-A-DR-NA-03-114-P03-Grid Floor GA Proposed SMH-BLA-A-DR-NA-RF-115-P03-Roof GA Proposed SMH-BLA-A-DR-ZZ-ZZ-220-P01-Proposed North Elevation SMH-BLA-A-DR-ZZ-ZZ-221-P01-Proposed East and West Elevations SMH-BLA-A-DR-ZZ-ZZ-222-P01-Proposed South Elevation SMH-BLA-A-DR-NA-ZZ-250-P03-S-01 Corporation Street Section SMH-BLA-A-DR-NA-ZZ-251-P03-S-02 Auditorium Long Section SMH-BLA-A-DR-SMG-ZZ-253-P02–S-A-St Mary’s Gate Section SMH-BLA-A-DR-SBL-ZZ-255-P02- S-C-Auditorium Short Section 1620009278-RAM-ZZ-XX-DR-S-00015 – PO1 1620009278-RAM-ZZ-XX-DR-S-00016 – PO1 1620009278-RAM-ZZ-LG-DR-S-00100 – PO2 1620009278-RAM-ZZ-00-DR-S-00101 – PO2 1620009278-RAM-ZZ-01-DR-S-00102 – PO2 1620009278-RAM-ZZ-02-DR-S-00103 – PO2 1620009278-RAM-ZZ-03-DR-S-00104 – PO2 1620009278-RAM-ZZ-ZZ-DR-S-00110 – PO2 1620009278-RAM-ZZ-XX-DR-S-00200 – PO2 1620009278-RAM-ZZ-ZZ-DR-S-00201- PO2 4038-0001-topographical survey
3. No construction works on the Station Back Lane extension to the building shall commence until: a) a scheme of intrusive site investigations has been carried out on site to establish the risks posed to the development by past coal mining activity, and; b) any remediation works and/or mitigation measures to address land instability arising from coal mining legacy, as may be necessary, have been implemented on site in full in order to ensure that the site is made safe and stable for the development proposed. The intrusive site investigations and remedial works shall be carried out in accordance with authoritative UK guidance.
4. Prior to the new Station Back Lane extension to the building being taken into beneficial use, ... view the full minutes text for item 93. |