Agenda and minutes

Planning Committee - Monday, 28th February, 2022 1.00 pm

Venue: Winding Wheel Theatre, 13 Holywell Street, Chesterfield S41 7SA

Contact: Amanda Clayton  01246 345273

Items
No. Item

91.

Apologies for Absence

Minutes:

Apologies for absence were received from Councillors Callan, Gilby and Marriott.

92.

Declarations of Members' and Officers' Interests Relating to Items on the Agenda

Minutes:

No declarations of interest were received.

93.

Applications for Planning Permission - Plans Determined by the Committee pdf icon PDF 99 KB

Additional documents:

Minutes:

*The Committee considered the under-mentioned applications in light of reports by the Development Management and Conservation Manager

and resolved as follows:-

 

CHE/21/00801/FUL & CHE/21/00802/LBC - REFURBISHMENT, ALTERATION AND EXTENSION OF THE GRADE II LISTED STEPHENSON MEMORIAL HALL – POMEGRANATE THEATRE, MUSEUM & ART GALLERY – TO CREATE AN INTEGRATED CULTURAL CENTRE THROUGH THE INTERGRATION OF THE EXISTING THEATRE AUDITORIUM AND MUSEUM SPACES AT CORPORATION STREET, CHESTERFIELD FOR BAUMAN LYONS ARCHITECTS obo CHESTERFIELD BOROUGH COUNCIL.

 

In accordance with Minute No. 299 (2001/2002) Mrs Janet Murphy (objector), Mr John Dickinson (representations on the proposals), and Councillor Sarvent (Cabinet Member for Town Centres and Visitor Economy) addressed the meeting. Mr Simon Maddy (applicant’s architect) and Mr Anthony Radford (applicant Cultural Services Manager) answered questions from the committee.

 

That the officer recommendation be upheld and the applications be approved subject to the following conditions:-

 

CHE/21/00801/FUL

 

1.    The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

 

2.    The development hereby approved shall only be carried out in full accordance with the approved plans (listed below) with the exception of any approved non material amendment. All external dimensions and elevational treatments shall be as shown on the approved plan/s (listed below).

 

SMH-BLA-A-DR-ZZ-ZZ-001-P01-1:1250 Location Plan

SMH-BLA-A-DR-ZZ-ZZ-002-P01-1:200 Existing Site Plan

SMH-BLA-A-DR-ZZ-ZZ-100-P01-1:200 Proposed Site Plan

SMH-BLA-A-DR-NA-LG-015-P02-Lower Ground GA Existing

SMH-BLA-A-DR-NA-UG-016-P02-Upper Ground GA Existing

SMH-BLA-A-DR-NA-01-017-P02-First Floor Mezzanine GA Existing

SMH-BLA-A-DR-NA-02-018-P02-Second Floor GA Existing

SMH-BLA-A-DR-NA-RF-020-P01-Roof Plan Existing

SMH-BLA-A-DR-NA-03-019-P02-Grid Floor GA Existing

SMH-BLA-A-DR-NA-RF-025-P02-Lower Ground Interventions

SMH-BLA-A-DR-NA-RF-026-P02-Upper Ground Interventions

SMH-BLA-A-DR-NA-01-027-P02-First Floor Mezzanine Interventions

SMH-BLA-A-DR-NA-01-028-P02-Second Floor Interventions

SMH-BLA-A-DR-NA-01-030-P02-Roof Floor Interventions

SMH-BLA-A-DR-ZZ-ZZ-035-P01-Existing North Elevation

SMH-BLA-A-DR-ZZ-ZZ-036-P01-Existing East and West Elevations

SMH-BLA-A-DR-ZZ-ZZ-037-P01-Existing South Elevation

SMH-BLA-A-DR-ZZ-ZZ-040-P01-North Elevation - Fabric Repairs

SMH-BLA-A-DR-ZZ-ZZ-041-P01-East and West Elevations - Fabric Repairs

SMH-BLA-A-DR-ZZ-ZZ-042-P01-South Elevation - Fabric Repairs

SMH-BLA-A-DR-ZZ-ZZ-050-P01-S-01 Corporation Street Section

SMH-BLA-A-DR-ZZ-ZZ-051-P01-S-02 Auditorium Long Section

SMH-BLA-A-DR-SMG-ZZ-053-P01-S-A-St Mary’s Gate Section

SMH-BLA-A-DR-ZZ-ZZ-055-P01- S-C-Auditorium Short Section

SMH-BLA-A-DR-NA-LG-110-P08-Lower Ground GA Proposed

SMH-BLA-A-DR-NA-UG-111-P09-Upper Ground GA Proposed

SMH-BLA-A-DR-NA-01-112-P09-First Floor Mezzanine GA Proposed

SMH-BLA-A-DR-NA-02-113-P08-Second Floor GA Proposed

SMH-BLA-A-DR-NA-03-114-P03-Grid Floor GA Proposed

SMH-BLA-A-DR-NA-RF-115-P03-Roof GA Proposed

SMH-BLA-A-DR-ZZ-ZZ-220-P01-Proposed North Elevation

SMH-BLA-A-DR-ZZ-ZZ-221-P01-Proposed East and West Elevations

SMH-BLA-A-DR-ZZ-ZZ-222-P01-Proposed South Elevation

SMH-BLA-A-DR-NA-ZZ-250-P03-S-01 Corporation Street Section

SMH-BLA-A-DR-NA-ZZ-251-P03-S-02 Auditorium Long Section

SMH-BLA-A-DR-SMG-ZZ-253-P02–S-A-St Mary’s Gate Section

SMH-BLA-A-DR-SBL-ZZ-255-P02- S-C-Auditorium Short Section

1620009278-RAM-ZZ-XX-DR-S-00015 – PO1

1620009278-RAM-ZZ-XX-DR-S-00016 – PO1

1620009278-RAM-ZZ-LG-DR-S-00100 – PO2

1620009278-RAM-ZZ-00-DR-S-00101 – PO2

1620009278-RAM-ZZ-01-DR-S-00102 – PO2

1620009278-RAM-ZZ-02-DR-S-00103 – PO2

1620009278-RAM-ZZ-03-DR-S-00104 – PO2

1620009278-RAM-ZZ-ZZ-DR-S-00110 – PO2

1620009278-RAM-ZZ-XX-DR-S-00200 – PO2

1620009278-RAM-ZZ-ZZ-DR-S-00201- PO2

4038-0001-topographical survey

 

3. No construction works on the Station Back Lane extension to the building shall commence until:

a) a scheme of intrusive site investigations has been carried out on site to establish the risks posed to the development by past coal mining activity, and;

b) any remediation works and/or mitigation measures to address land instability arising from coal mining legacy, as may be necessary, have been implemented on site in full in order to ensure that the site is made safe and stable for the development proposed.

The intrusive site investigations and remedial works shall be carried out in accordance with authoritative UK guidance.

 

4. Prior to the new Station Back Lane extension to the building being taken into beneficial use,  ...  view the full minutes text for item 93.